Medical Pendant Systems for OR and ICU Integration

Support project teams with pendant systems, CAD installation guidance, and configuration planning for ceiling load, gas outlets, and power interfaces.

Medical pendant system installed in an OR/ICU ceiling configuration

What Needs to Be Confirmed Before Pendant Installation

Pendant systems are engineering integration products, not plug-and-play accessories. Getting ceiling load, gas interfaces, and arm reach right at the planning stage prevents costly on-site rework.

01

Ceiling Load and Structural Assessment

Confirm ceiling type, load-bearing capacity, and embedment requirements before ordering. Different ceiling structures require different mounting solutions and reinforcement strategies.

02

Gas Outlet and Power Interface Configuration

Map medical gas types, outlet quantities, and power socket specifications to local hospital standards. Interface mismatches discovered after delivery are a preventable risk.

03

Arm Reach and Workspace Layout

Determine arm length, rotation radius, and service head positioning based on OR or ICU room dimensions. Proper layout planning maximizes clinical workspace efficiency.

CAD Drawings and Pre-install Coordination Reduce Site Risk

The difference between a smooth installation and a delayed project often comes down to pre-install documentation. CAD drawings, multi-arm structure data, and installation guidance are part of our standard project support package.

CAD Embedment Drawings

Pre-install CAD documentation helps EPC teams and hospital engineering departments review mounting requirements, conduit routing, and ceiling interface details before construction begins.

Multi-arm Structure Capability

Single-arm and multi-arm configurations support different OR and ICU layouts. Structural data and load distribution information are provided for accurate MEP coordination.

Installation Guidance Videos

Video documentation supports cross-border delivery scenarios where on-site supervision may be limited. This reduces dependency on in-person technical support for standard installations.

Questions Project Teams Ask Before Pendant Approval

Can your pendants match local gas standards?

Gas outlet and interface planning are part of our project coordination process. During the pre-install phase, we confirm gas type specifications, terminal standards, and outlet configurations against your local regulatory and hospital requirements.

How should we evaluate ceiling load?

Pre-install guidance and CAD-based review happen before site execution. We provide structural load data for your engineering team to verify against ceiling specifications. This step prevents installation surprises and reduces project risk.

Can we submit drawings before quotation?

Yes. Drawing submission is positioned as a key conversion step in our project workflow. Submit your room layouts and we will review them against pendant specifications to provide a configuration-matched quotation.