OR Equipment Commissioning Checklist: From Crate to First Surgery
The day a new operating room receives its equipment is not the day the room is ready. Between the crate and the...
Read ArticleInstallation requirements (ceiling, floor, electrical, gas), commissioning, troubleshooting, spare parts inventory, maintenance schedules, and UPS/battery backup.
The day a new operating room receives its equipment is not the day the room is ready. Between the crate and the...
Read Article
Between the hospital bed frame and the pressure-care mattress sits a small engineering problem most buyers never specify: keeping the mattress where...
Read Article
An operating room loses mains power mid-case, and the next three seconds decide which backup strategy actually works. The UPS carries the...
Read Article
Bed rails are the most-touched moving part on a ward bed and the feature regulators watch most closely, because the gap between...
Read Article
Hospital beds fail on a schedule whether hospitals schedule maintenance or not. The difference between the two is cost: a ward that...
Read Article
Hospital trolleys live on their castors, and castor complaints, squeaks, flat spots, broken brakes and floor marks, are among the most common...
Read Article
The surgical light handle is the only part of the OR ceiling equipment that every member of the team touches mid-procedure, which...
Read Article
Quick answer: A ceiling mounted surgical light needs anchors rated for four times the head weight, a mount height between 2.8 m...
Read Article
Operating room downtime is expensive because an idle OR still burns staff, overhead and scheduled case slots. The way to shrink that...
Read Article
Operating table battery replacement is the routine swap of the integrated backup battery that keeps an electric or electro-hydraulic table articulating during...
Read Article